Changes between Version 2 and Version 3 of 2014WP/NOC
- Timestamp:
- 2013-10-29T18:26:37+01:00 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
2014WP/NOC
v2 v3 9 9 10 10 || Name || Institution || % || Position || 11 || xx || xx || xx || xx||11 || Andrew Coward || NOCS || 60 || NEMO Officer || 12 12 13 13 Summary: List here actions of the institution so as contributions to [https://forge.ipsl.jussieu.fr/nemo/wiki/2014WP/2014Stream0 shared actions] 14 14 15 || Action || Brief description || Status || Branch name || Trac ticket n° || Wiki page name || Reviewer(s) || Review status || Nb of weeks || Ready for merge If "NO", reason and status for 2015 || 16 || NOC-1 || xx || xx || || || || || || || || 15 || Action || Brief description || Status || Branch name || Trac ticket n° || Wiki page name || Reviewer(s) || Review status || Nb of weeks || Ready for merge If "NO", reason and status for 2015 || 16 || NOC-1 || Refinement of Griffies operator || || || || || || || || || 17 || NOC-2 || Testing, validation and commissioning of recent major changes || || || || || || || || || 18 || NOC-3 || System simplification || || || || || || || || || 17 19 18 20 ---- 19 === '''NOC-1 - title''' === 20 ''' Motivation: ''' xx [[BR]] ''' Status :''' xx [[BR]] ''' Main tasks :''' xx[[BR]] ''' Science Reviewer:''' [[BR]] ''' System Reviewer:''' [[BR]] ''' Deadline:''' [[BR]] ''' Priority:''' [[BR]] ''' Depends on:''' [[BR]] ''' Principal Investigator : ''' xx 21 === '''NOC-1 - Refinement of Griffies operator''' === 22 ''' Motivation: ''' Improvements to the computation of properties along isopycnal slopes and a full investiagtion into opportunities for optimising performance [[BR]] ''' Status :''' xx [[BR]] ''' Main tasks :''' Add algorithmic improvements. Profile performance on at least two architectures. Investigate bottlenecks and look for generic improvements in performance that can be made without compromising code readability.[[BR]] ''' Science Reviewer:''' George Nurser [[BR]] ''' System Reviewer:''' Gurvan Madec [[BR]] ''' Deadline:''' Aug 2014 [[BR]] ''' Priority:''' [[BR]] ''' Depends on:''' [[BR]] ''' Principal Investigator : ''' Andrew Coward 23 24 === '''NOC-2 - Testing, validation and commissioning of recent major changes''' === 25 ''' Motivation: ''' NOCS is responsible for several recent additions which need more thorough testing to establish them as acceptable default options. These are: a. The Griffies operator; b. Z-tilde verical coordinate and c. Ice embedding. A major component of the NOC 2014 work-plan will be to test these options both individually and in concert in demanding global configurations.[[BR]] ''' Status :''' xx [[BR]] ''' Main tasks :''' Set up test cases with ORCA1, ORCA025 and ORCA0083. Perform multi-centennial tests with ORCA1; multi-decadal tests with ORCA025 and high-variability tests (e.g. tides) with ORCA0083. Document recommeneded settings and results. [[BR]] ''' Science Reviewer:''' Gurvan Madec [[BR]] ''' System Reviewer:''' [[BR]] ''' Deadline:''' Sept 2014 [[BR]] ''' Priority:''' [[BR]] ''' Depends on:''' NOC-1 [[BR]] ''' Principal Investigator : ''' Andrew Coward 26 27 === '''NOC-3 - System simplification''' === 28 ''' Motivation: ''' As a first step towards system simplification unused options will be removed and the non-linear free surface will become the default. [[BR]] ''' Status :''' xx [[BR]] ''' Main tasks :''' Remove the unrecommended Neptune options. Add thickness weighted tendency calculations as default. Make the non-linear free surface the default. [[BR]] ''' Science Reviewer:''' [[BR]] ''' System Reviewer:''' [[BR]] ''' Deadline:''' [[BR]] ''' Priority:''' [[BR]] ''' Depends on:''' [[BR]] ''' Principal Investigator : ''' Andrew Coward