Version 6 (modified by rblod, 14 years ago) (diff) |
---|
LOCEAN-NEMO team - 2011 actions
Last edited Timestamp?
members
Name | Institution | % | Position |
Rachid Benshila | LOCEAN-IPSL, Paris | 100 | CNRS |
Christian Ethé | IPSL, Paris | 50 | CNRS |
Simona Flavoni | LOCEAN-IPSL, Paris | 100 | CNRS-INSU 1 year contract |
Claire Lévy | LOCEAN-IPSL, Paris | 100 | NEMO project Manager |
Bénédicte Lemieux | LEGI - Grenoble | 50 | CNRS 2 years contract (Arrived in Oct. 2009) |
Sébastien Masson | LOCEAN-IPSL, Paris | 50 | CNAP |
Marie-Alice Foujols | IPSL, Paris | 5 | CNRS |
Marina Lévy | LOCEAN-IPSL, Paris | 5 | CNRS |
Gurvan Madec | LOCEAN-IPSL, Paris | 30 | NEMO Scientific Leader (CNRS) |
total weeks :
30 + 50 + 26 + 22 + 15 + 6 + 24 + 6 + 16 + 25 + 20 = 229 wk
Summary:
Action | Brief description | Status | Branch name | Trac ticket n° | Wiki page name | Reviewer(s) | Review status | Ready for merge |
LOCEAN-1 | a devlt |
LOCEAN .1 —MPP evolution' (continuation
Motivation: Improve the mpp behaviour of NEMO by playing with width of the overlap area, the number of communication,
Status :
Main tasks :
Science Reviewer:
System Reviewer:
Deadline: [BR]]Priority:
Principal Investigator : Rachid Benshila (rachid.benshila@…)
LOCEAN .2 —Coupled interface (end)
Motivation: Improve the mpp behaviour of NEMO by playing with width of the overlap area, the number of communication,
Status :
Main tasks :
(1) documentation of the coupled surface module (25 June)
(2)coupling with multi-categories ice model (coll. UKMO)
Science Reviewer:
System Reviewer:
Deadline: [BR]]Priority:
Principal Investigator : Sebastien Masson (smasson@…)
LOCEAN .3 —Merge TRA-TRP (end)
Motivation: Merge of active and passive tracer advection/diffusion modules to avoid duplication of almost identical modules
Status :
Main tasks :
(1) apply the merge for OBC, BDY,AGRIF
(2) suppress T and S array to switch to 4d arrays
Science Reviewer:
System Reviewer:
Deadline: [BR]]Priority:
Principal Investigator : Christian Ethé (cetlod@…)
LOCEAN .4 —reference manuels (continuation)
Motivation: paper documentation a never-ending story
Status :
Main tasks :
(1) Create the TRP documentation using Latex (similar to the NEMO ocean engine documentation)F
(2) update NEMO/OPA documentation
(3) review of the written documentation (NOCS team)Science Reviewer:
System Reviewer:
Deadline: [BR]]Priority:
Principal Investigator : Christian Ethé (cetlod@…)