Changes between Version 159 and Version 160 of PerformancesIPSLCM6


Ignore:
Timestamp:
07/25/18 10:50:16 (6 years ago)
Author:
mafoipsl
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PerformancesIPSLCM6

    v159 v160  
    1414 
    1515Voir : http://www.prace-ri.eu/prace-project-access/ 
    16  * Call 17  
    17    * Clos le 2 mai 2018 
    18    * Disponible sur irene :  
    19 || System       || Architecture || Site (Country) ||    Core Hours (node hours) || Minimum request || 
    20 || Irene (Joliot Curie) – SKL ||        Bull Sequana X1000      || GENCI@CEA (FR)       || 134 million (2.8 million) ||         15 million core hours || 
     16 
    2117 * Call 18 
    2218   * Opening of the call: 4 September 2018 
     
    2723   * Closing of the call: 30 April 2019, 10:00 Brussels time 
    2824   * Allocation period: From 1 October 2019 to 30 September 2020 
     25 * Pour mémoire : Call 17  
     26   * Clos le 2 mai 2018 
     27   * Disponible sur irene :  
     28|| System       || Architecture || Site (Country) ||    Core Hours (node hours) || Minimum request || 
     29|| Irene (Joliot Curie) – SKL ||        Bull Sequana X1000      || GENCI@CEA (FR)       || 134 million (2.8 million) ||         15 million core hours || 
    2930 
    3031== Demandes d'heures A5 : date limite 22 août 2018 11h ==