Changes between Version 150 and Version 151 of PerformancesIPSLCM6


Ignore:
Timestamp:
06/20/18 10:01:30 (6 years ago)
Author:
mafoipsl
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PerformancesIPSLCM6

    v150 v151  
    77   * Ressources disponibles 
    88   * Performances des configurations IPSL 
     9 * Ajout informations Prace 
    910 * Déplacement des paragraphes CMIP6 à la fin de la page 
     11 
     12 
     13== Prochains appels Prace == 
     14 
     15Voir : http://www.prace-ri.eu/prace-project-access/ 
     16 * Call 17  
     17   * Clos le 2 mai 2018 
     18   * Disponible sur irene :  
     19   || System    || Architecture || Site (Country) ||    Core Hours (node hours) || Minimum request || 
     20   || Irene (Joliot Curie) – SKL ||     Bull Sequana X1000      || GENCI@CEA (FR)       || 134 million (2.8 million) ||         15 million core hours || 
     21 * Call 18 
     22   * Opening of the call: 4 September 2018 
     23   * Closing of the call: 30 October 2018, 10:00 Brussels time 
     24   * Allocation period: From 2 April 2019 to 1 April 2020 
     25 * Call 19 
     26   * Opening of the call: 5 March 2019 
     27   * Closing of the call: 30 April 2019, 10:00 Brussels time 
     28   * Allocation period: From 1 October 2019 to 30 September 2020 
    1029 
    1130== Demandes d'heures A5 : date limite 17 juillet 2018 11h ==